Preliminary Ecological Assessment (PEA), Clutton, Somerset

NPT Engineering & Environmental Ltd (NPTEE) was commissioned by BPB Architect to complete a Preliminary Ecological Assessment (PEA) at one of their development sites in the village of Clutton in Somerset in August 2022. The development sought planning permission from Bath & North East Somerset (B&NES) for the erection of a two storey side extension following the demolition of an existing single story side extension.

Following consultation with the B&NES County Ecologist, they determined an ecological and protected species survey and assessment was required prior to determination of the planning application along with mitigation and enhancement proposals. It was anticipated the proposals would affects a historic building, with a pitched tiled roof and likely crevices and dark /hidden spaces, including roof voids, located in a well-vegetated area of the village of Clutton, with mature trees and hedgerows adjacent to the works. A designated Site of Nature Conservation Interest (SNCI) “Clutton dismantled railway and Fry’s Bottom” also lies approximately 160m to the west of the site. The building, proposed development site, and the immediate surroundings therefore provided highly suitable conditions and habitats for use by a range of wildlife, including protected species in particular bats and birds and it was anticipated there is reasonable risk of use of the building by bats.

The purpose of the PEA was to identify any potential impacts on biodiversity from the proposals and identify any requirement for mitigation. The Extended Phase 1 Survey covered vegetation types and plant species, birds, invertebrates and badger whilst habitat potential for other species was assessed where the survey area extended as far as possible to all areas within 50m of the proposed works.

The survey identified the walls of the house were pebble-dashed and are in good repair. The eaves in the area that would be affected, on both the main house and the extension, were thoroughly sealed and gaps are absent. The tiles on both the roof of the extension and the main roof are snug and well fitting. The door and window frames were well-fitted, and gaps and crevices were absent. There were no hanging boards or similar features. The room in the main part of the extension is open to the roof, but a smaller area in the western part of the extension has a boxed-off roof space and there are no potential access points to this small roof space. The walls, eaves and roof of both the extension and the main house lacked any potential access points for bats, and both structures have negligible potential for roosting bats.

The garden area that would be affected by the works was largely paved, with plants in pots. The only area of vegetation that would be affected is dominated by Himalayan honeysuckle (Leycesteria formosa) and lemon balm (Melissa officinalis). The boundary to the east of the site was dominated by ornamental shrubs and ivy (Hedera helix); other parts of the boundary include semi-mature trees of ash (Fraxinus excelsior) and ornamental cherry (Prunus sp). No birds or insects were seen in the application site. Bird species present in the surrounding area included blackbird, blue tit, chaffinch, jackdaw, magpie, robin, wood pigeon and wren.  There were no badger setts or other signs of badger activity were seen and there were no trees with the potential to support roosting bats either on the site or in adjacent areas.

The survey concluded the application site and the areas adjacent to it do not have potential for protected species and are of minimal nature conservation value. The proposals would not have any ecological impact of any significance. The scale of the proposals and their location within a domestic garden mean that there are no potential impacts on any of the designated sites in the surrounding area.

B&NES Council’s Policy NE1 of the approved Local Plan, which applies to the site due to its location within an area identified a Green Infrastructure Network, is as follows:

“1 Within the context of Policy CP7 development will be permitted provided:

  1. a) it can be demonstrated that opportunities have been maximised to design Green Infrastructure (GI) into the proposed development;
  2. b) it does not adversely affect the integrity and value of strategic GI corridors;
  3. c) the scheme makes a positive contribution to the GI network through the creation, enhancement and management of new, and existing GI assets; and

2 Proposals for major developments should also be accompanied by:

  1. a) a plan of the existing green infrastructure assets within and around the development site; and b) a GI “proposal” demonstrating how GI has been incorporated into the scheme in order to increase function and improve connectivity of GI assets including links to existing the local and strategic networks.

3 Developers will be required to address GI in any submitted site Masterplan which as a minimum fulfils the requirements of clauses 1) and 2) above.”

The proposal would not affect the integrity and value of the strategic GI corridor, is not a major development and the policy requires that the development makes a contribution to the GI network. Given the scale of the proposal, it was recommended that a single bat box is fitted to a tree in the garden in order to support B&NES Council’s policy. As a result of NPTEE’s involvement with the development works, the planning application was granted on 28 October 2022 and the works were able to proceed.